A mandatory stage of preparation (concrete slab, cement-sand screed, etc.) during insulation work before laying surfaced and self-adhesive roofing materials
Packaging:
the primer is packed in a metal sealed container. The filling volume of the container is not more than 90%.
Name of indicators |
Meaning |
Appearance |
Homogeneous mass of black color without foreign inclusions |
Contents of the a.s.v.,% |
30-35 |
Drying time, hour, at t=(20±2)◦C, no more |
12 |
Get price calculation and shipment on the day of your request.